Removed damaged stone seawall. Formed cast in place, battered concrete sea wall with form liner seaside finish. Installed natural stone faced seawall on land side and 2000 tons of stone revetment.
In Newport, RI, our professional team was tasked with repairing hurricane damaged sections of the Kings Park seawall as well as building new additions to the existing seawall for reinforcement at Kings Park.
In Jamestown, RI, we formed and poured all dock curbing and piers. Also, we installed all steel railing systems, new electric service, and electric pedestals. Carpentry services including chaffing rails and platform ladders.
In Portsmouth, RI, we handled the demolition of the existing concrete boat ramp and installed a new pre-cast concrete boat ramp and asphalt paving. The toe of the new boat ramp was 12′ below the water surface.