In Jamestown, RI, we provided the completion of the woodframe construction at this public restroom facility on the waterfront, including an ADA concrete ramp and rails as well as ADA restroom interior.
In Lincoln, RI, our team planned and installed a concrete encased high-voltage electrical service including trench digging and complex concrete work. The service ran through the 18th fairway to the pump station building.
At this Subway in Lincoln, RI, we handled the demolition of the existing site, carpentry, painting, HVAC, electric, plumbing, tile, and installation of equipment and signage.
At Twin River Casino in Lincoln, RI, we provided complete tenant fit out including existing demolition, carpentry, painting, wall covering, electrical, plumbing, HVAC, signage, floor covering, and installation of food vendor supplied equipment.
We performed the demolition of the existing stair and foundation and installed a new concrete foundation and blue stone stairway ornamental iron rails set in lead.
Our professional team replaced the entire parking lot at the hospital in Providence, RI. The project involved full asphalt removal and resurfacing of the parking area followed by full asphalt replacement.
We completed the total removal and disposal of the existing asphalt parking lot. Then our team prepared the area and proceeded to fine grade, pave, and install the proper painted traffic markings.
Complete demolition of existing offices and rebuilding of new offices, lunch
room, locker/restrooms. Also, structural repairs and front entrance rebuilding due to vehicle accident.